Featured Projects

Rampal Power Plant

Rampal 1320 MW Power Plant

Portfolio Rampal 660 x2 MW Tharmal Power Plant, Khulna (Township Package) Supply Installation Testing & Commissioning of Fire Detection Fire Hydrant and Protection System for the complete township package. Supply, Erection, lnstallation, Testing, Commissioning of Firefighting system (Fire Hydrant Standpipe and Automatic Fire Sprinkler System) Addressable Fire Detection & Alarm…
Read More
Sepal Group

Sepal Group

Portfolio Sepal Garments Ltd- Gazipur, Dhaka Fire Detection System Fire Pumps set Automatic Sprinkler System Works Gallery Certification Let’s see what Sepal speaks about us ?? Related Projects Rampal 1320 MW Power Plant GMS Textiles Ltd. Azim Group (Woven Division) BRB HOSPITALS LIMITED Berger Paints Bangladesh Ltd. Karmasangsthan Bank Bay…
Read More
GMS Textiles Ltd

GMS Textiles Ltd.

Portfolio GMS Textiles Ltd, Gazipur, Dhaka Installation Fire Detection & Alarm Control Systems with BMS Integration Fire Alarm Control Panel Smoke, Heat, Multi & Beam Detectors, MCP Module Works Gallery Certification Let’s see what GMS Textiles speaks about us ?? Related Projects Rampal 1320 MW Power Plant Sepal Group Azim…
Read More
Azim-GroupWoven-Division

Azim Group (Woven Division)

Portfolio Azim Group (Woven Division), Kalurghat, Ctg Installation Fire Detection & Alarm Control Systerns (Smoke, Heat, Multi & Beam Detector, MCP, Module etc.)* Brand: COFEM, origin- Spain. Fire Hydrant Systems (Breeching lnlet, Pillar Hydrants, Landing Valves etc.) -Brand: SFFECO, origin- UAE Fire Sprinkler Systems- Brand: SFFECO-UAE, LIFECO- UK Fire Purnp…
Read More
BRB Hospital

BRB HOSPITALS LIMITED

Portfolio BRB Hospital Limited, Dhaka Supply Installation of Addressable Fire Dtection Fire Alarm System Works Gallery Related Projects Rampal 1320 MW Power Plant Sepal Group GMS Textile Azim Group(Woven Division) Berger Paints Bangladesh Ltd. Karmasangsthan Bank Bay Developments Ltd Epic Garments Manufacturing Co. Ltd Orascom Telecom Bangladesh Ltd (Bangla link)…
Read More
Berger-Paints-Bangladesh-

Berger Paints Bangladesh Ltd.

Portfolio Berger Paints BD Ltd, Chittagong Installation Design Drawings Supply Design, Drawings, supply, installation & commissioning of Fire Protection System (Fire Hydrant and Auto Foaming system) with UL Listed Fire Pump set (1250 GPM@11 bar) along with supply of all required materials. Design, Drawings, supply, installation & commissioning of Addressable…
Read More
Karmasangsthan Bank

Karmasangsthan Bank

Portfolio Karmasangsthan Bank, Motijheel, Dhaka Installation NOVEC 1230 Clean agent-based Gas Suppress system is installed in Server Room and Power Room Works Gallery Certification Related Projects Rampal 1320 MW Power Plant Sepal Group GMS Textile Azim Group(Woven Division) BRB HOSPITALS LIMITED Berger Paints Bangladesh Ltd. Bay Developments Ltd Epic Garments…
Read More
bay-development

Bay Developments Ltd, Projects

Experience We have successfully completed the projects for Design, Drawings, Supply, installation, Testing, Commissioning of Firefighting system (Fire Hydrant standpipe and Automatic Fire Sprinkler), Fire Detection & Alarm Control System, Fire Suppression systems etc. on turnkey basis as per Bangladesh National Building Code (BNBC), Bangladesh Fire Prevention & Dousing Act…
Read More
NBR Customs House at Dhaka International Airport

NBR Customs House at Dhaka International Airport

Portfolio NBR Customs House at Dhaka International Airport Supply Installation Testing, & Commissioning of Fire Detection & Auto Fire Suppression Systems (NOVEC 123O). Works Gallery Related Projects Rampal 1320 MW Power Plant Sepal Group GMS Textile Azim Group(Woven Division) BRB HOSPITALS LIMITED Berger Paints Bangladesh Ltd. Karmasangsthan Bank Bay Developments…
Read More