EPIC GARMENTS (EGMCL), Unit-4 Adamjee EPZ, Narayangonj
Design
Drawing
Supply
Installation
Testing commissioning of Evaporative Air Cooling System
Floor Size: 2,00,000 SFT (1,00,000 x 2 floor) Ground Floor-1,00,000 SFT (by Internal Ducting) 1st Floor-1,00,000 SFT (Roof Top installation)
Quantity of m/c: 171 Units, 30000 m^3/hr-40 unit, 18000 m^3/hr-131 unit Note: This is the biggest Evaporative Cooling project in Bangladesh